VELNARKInspection Services

Starting with Velnark

Everything you need before the first inspection.

A sample report for each inspection type, so you know exactly what you will receive, and the documents each one needs, marked by whether they come from you or from your vendor. Share this page with your vendor too.

  1. 01

    Send the project details

    Reply with your purchase order or enquiry, drawings and delivery date. We sign an NDA first if you prefer.

  2. 02

    Receive a proposed ITP and quotation

    Usually within one working day. The quotation is fixed against a defined scope.

  3. 03

    Get your portal login

    Once the purchase order reaches us by email, we create your account and send the sign-in details.

  4. 04

    Follow the project live

    Status, photographs, video and reports for every item, in one place, for as long as you need them.

Needed for every inspection

Whatever the type, these five come first. The lists below are what each type adds.

From youFrom your vendorFrom either
  • Purchase order or contract copy

    Scope, quantity, delivery date and acceptance terms

    From you
  • Drawings and bill of materials

    Latest approved revision

    From you
  • Specification or datasheet

    The document the product is measured against

    From you
  • Agreed Inspection & Test Plan (ITP)

    Velnark drafts it; you and the vendor acknowledge it

    From either
  • Vendor contact and works address

    Who raises the inspection call, and where we go

    From you

01

Raw Material Inspection

Verify the inputs before they become the product.

Sample reportPDF

Documents this inspection needs

  • Approved make and supplier list

    From you
  • Material test reports for each lot or heat

    Supplier-issued, referenced to the marking on the material

    From your vendor
  • Incoming inspection records

    From your vendor
  • Lot, batch or heat traceability record

    From your vendor
  • Calibration records of measuring instruments

    From your vendor
  • Storage and preservation arrangements

    Where and how material is held before use

    From your vendor

02

In-process Inspection

Catch it while it is still fixable.

Sample reportPDF

Documents this inspection needs

  • Process sheets or work instructions

    From your vendor
  • Sub-assembly and critical-dimension drawings

    From you
  • In-process inspection records to date

    From your vendor
  • Technician and operator qualification records

    From your vendor
  • Calibration records of instruments and gauges

    From your vendor
  • Production schedule with hold points marked

    So the inspection call lands before the stage, not after

    From your vendor

03

Final Inspection

The finished product, checked end to end.

Sample reportPDF

Documents this inspection needs

  • Acceptance criteria and tolerances

    If not already in the specification

    From you
  • Final inspection checklist

    From your vendor
  • Dimensional and visual inspection report

    From your vendor
  • Functional or operational test record

    From your vendor
  • Nameplate, label and marking drawing

    From you
  • Records from earlier stages

    Raw material and in-process, for review

    From your vendor

04

FAT (Factory Acceptance Test)

Witnessed properly, recorded fully.

Sample reportPDF

Documents this inspection needs

  • Approved FAT procedure

    Tests, sequence, pass/fail criteria, duration

    From either
  • Performance datasheet and guaranteed values

    From you
  • Test set-up drawing or schematic

    From your vendor
  • Test instrument list with calibration records

    From your vendor
  • Software or firmware version record

    Where the product has any

    From your vendor
  • Blank test sheets

    Filled in and signed during the test

    From your vendor

05

Pre-Dispatch Inspection

The last gate before it leaves.

Sample reportPDF

Documents this inspection needs

  • Packing and preservation specification

    From you
  • Shipping marks and consignee details

    From you
  • Packing list and bill-of-material reconciliation

    From your vendor
  • Loose spares and accessories list

    From your vendor
  • Preservation records

    From your vendor
  • Reports from every earlier stage

    The dossier is checked complete before release

    From your vendor

06

Vendor Assessment & Development

Before you commit — and after.

Sample reportPDF

Documents this inspection needs

  • What you intend to buy, volumes and delivery dates

    From you
  • Company profile and capability statement

    From your vendor
  • Machine and equipment list

    From your vendor
  • Quality manual, procedures and inspection plans

    From your vendor
  • Calibration register

    From your vendor
  • Organisation chart and qualification records

    From your vendor
  • Sub-vendor list for bought-out items

    From your vendor

Ready when you are.

Send the project details and we come back with a proposed inspection plan and a fixed quotation, usually within one working day. Once your purchase order reaches us, your portal login follows.

  • No retainer — one project is enough to start
  • NDA before you share drawings
  • One permanent record per project